Camp Facilities
Construction of camp facilities at Syauli Bazar for the Upper Modi Hydroelectric Project, including office spaces, staff accommodations, storage units, and site utilities. This infrastructure serves as the operational and residential base for project personnel.
Upper Modi A HEP
Lot-1 – Civil and Hydromechanical Works (UMAHEP)
Construction of diversion weir, intake, gravel trap, approach canal, desanding basin, headrace tunnel, surge tank, powerhouse, and tailrace; including hydromechanical works such as gates, valves, and penstocks.
Lot-2 – Electromechanical Works (UMAHEP)
Design, supply, installation, and commissioning of Pelton turbines, generators, excitation systems, control systems, and auxiliaries.
Lot-3 – Transmission Line and Substation Works (UMAHEP)
Design and construction of the 132 kV transmission line and substation components connecting both projects to the New Modi Substation.
Upper Modi HEP
Lot-1 – Civil and Hydromechanical Works (UMHEP)
Construction of interconnection structure, head pond, tunnel, surge tank, vertical shaft, powerhouse, tailrace, and hydromechanical installations.
Lot-2 – Electromechanical Works (UMHEP)
Design, supply, installation, and commissioning of Fransis turbines, generators, excitation systems, control systems, and auxiliaries.