A cascade run-of-river development using the same catchment area, this project has a gross head of 135.00 m, net head of 126.48 m, and an installed capacity of 18.2 MW, producing 109.217 GWh annually.
Particulars | Features |
---|---|
Location | Annapurna Rural Municipality, Kaski District, Gandaki Province, Nepal |
Type of project | Run-of- river |
Gross / net head | 135 m / 126.48m |
Design discharge | 16.15 m3/sec |
Installed capacity | 18.2 MW |
Annual Energy | 109.217 GWh |
Principal civil structures | |
Interconnection Arrangement | 700 m long 3.2 wide, 3.2m high, RCC Box Culvert type |
Interconnection Arrangement | 700 m long 3.2 wide, 3.2m high, RCC Box Culvert type |
Head pond | 32m long,10m wide 6.9m high |
Headrace Tunnel | 4244 m long, Modified Horseshoe-Shaped, 3.5 m internal dia. |
Surge Tank | 10 m dia., 38.6 m high, Restricted orifice type |
Vertical Shaft/Horizontal High- Pressure Pipe | 101.67 m long, 2.35 m dia., circular steel-lined /217.30m long, 2.35 dia., D-shaped Tunnel |
Adit Tunnels | Two Adit Tunnels, with a total length of 198 m |
Powerhouse | Surface/Semi Surface structure, 33m long, 15.5 m wide, 24 m high |
Switchyard | Outdoor conventional type, 57m long and 44 m wide |
Tailrace | 46 m long, comprising a 4 m wide and 2.95 m high box covered Canal. |
Turbine | Vertical Axis Francis, 2 x 9.113 MW with rated speed 600rpm |
Generator | 11kV voltage, three-phase AC with 10.71 MVA rated output |
Transmission Line | 132 kV, 11.5 km single circuit from UMA Powerhouse to New Modi Substation |