A run-of-river scheme designed with a gross head of 286.8 m and net head of 274.66 m, the project delivers an installed capacity of 42 MW, generating an average annual energy output of 243.587 GWh.

Particulars Features
Location Annapurna Rural Municipality, Kaski District, Gandaki Province, Nepal
Type of project Run-of- river
Gross / net head 286.8 m / 274.66m
Design discharge 17.4 m3/sec
Installed capacity 42 MW
Annual Energy 243.587 GWh (after outage)
Principal civil structures
Diversion Weir 6m high, 30 m long concrete weir with overflow spillways, each with 7.0 m wide and 13.5 m high radial gates
Undersluice One under sluice flushing channel with a radial gate of size 6m wide and 6m high
Intake Four numbers of side intake with size 3 m wide and 3 m high with rope drum-type hoist
Desanding Basins Two Surface Desander, each 90 m long, 10 m wide, and 9.2 m high
Headrace Tunnel 5968 m long, Modified Horseshoe-shaped, 3.5 m internal dia., 1048m concrete lined and 4920m shotcrete lined
Surge Tank 10 m dia., 43.6 m high, restricted orifice type
Vertical Shaft / Horizontal High -Pressure Pipe 246.24 m long, 2.35 m dia., circular steel-lined /597.30m long,2.35m dia., D-shaped tunnel
Adit Tunnels Two Adit Tunnels, with a total length of 287 m
Powerhouse Surface/Semi Surface structure, 36 m long, 15 m wide, 28.3 m high
Switchyard 50 m long and 47 m wide
Tailrace 96 m long, comprising a 4 m wide and 2.4 m high Box Covered Canal.
Turbine Vertical Pelton, 2 x 21 MW
Generator 11kV voltage, Synchronous type with 24.7 MVA Rated output
Transmission Line 132 kV, 11.5 km single circuit from UMAHEP Powerhouse to New Modi Substation